top of page


TN15
Installing stone path
Removed old stone path and relayed new brick with ACO drain running along the fill length of the path. Recast and laid the steps in reinforced concreate then brick. Redirected the water into a soak away to stop flooding.Â
The client wanted to minimise damage to the natural feel of the garden and for the plants to not be damaged. Due to ponding outside the rear doors we were required to remove all the water before laying the bicks, and ensure that the water ran into the new ACO drain.
Project Gallery












bottom of page